This post was last edited by lllllljjj on 2010-1-15 17:35 1. Chongqing 1.1 Coal mine technical transformation project with an annual output of 50,000 tons (2010, -) 1.2 Coal mine reconstruction and expansion project (2010, -) 1.3 200,000 tons of clean coal washing project with an annual output (2010, -) 1.4 Continued mining project with an annual output of 120,000 tons of raw coal (2010, -) 1.5 Renovation and expansion project with an annual output of 40,000 tons of raw coal (2010, -) 1.6 300,000 tons coal preparation project (2010, -) 1.7 Xiaoyutuo Coal Mine Project (2010, -) 1.8 New construction project of a coal preparation plant with an annual output of 3 million tons (2010, -) 1.9 Renovation and expansion project of raw coal with an annual output of 60,000 tons (2010, -) 1.10 Liujiagou Coal Mine expansion project (2010, -) 1.11 Technical renovation project of 350,000 tons of technical coal mine (2010, -) 1.12 Technical renovation project of Xinglong Coal Mine with an annual output of 40,000 tons of raw coal (2010, -) 11,300 Liang Coal Mine with an annual output of 120,000 tons of raw coal and technical transformation project (2010, -) 1.14 Coal Mine Integration Project with a production scale of 50,000 tons (2010, -) 1.15 Coal Mine Renovation and Expansion Project (2010, -) 1.16 Newly built 300,000 tons/year coal preparation project (2010, -) 1.17 Coal mine 60,000T/A reconstruction and expansion project (2010, -) 1.18 New construction project with an annual output of 60KT of raw coal (2010, -) 1.19 Renovation and expansion project of 40,000 tons of raw coal with an annual output (2010, -) 1.20 Coal mine integration project (2010, -) 1.21 Coal mine technological transformation project (2010, -) 1.22 Integrated technical transformation project with an annual output of 50,000 tons of raw coal (2010, -) 1.23 Coal mine reconstruction and expansion project (2010, -) 1.24 Coal mine expansion project (2010, -) 1.25 Mining 60KT coal mine expansion project (2010, -) 1.26 Mining 50KT coal mine reconstruction and expansion project (2010, -) 1.27 Coal mine reconstruction and expansion project (2010, -) 1.28 New 300,000 T/A coal washing plant project (2010, -) 1.29 Mining 150,000 tons of raw coal project (2010, -) 1.30 Xinglong Coal Mine annual output of 40,000 tons of raw coal technological transformation project (2010, -) 1.31 Annual output of 60KT coal resource integration project (2010, -) 1.32 Annual output of 60,000 tons of raw coal project ((2010, -) 1.33 Annual output of 40,000 T/A raw coal mining project (2010, -) 1.34 Annual output of 40,000 tons of raw coal engineering project (2010, -) 2. Yunnan 2.1 Yuwang Coal Mine Project (2010, -) 2.2 Fuyuan County Songzishan Coal Mine New Construction Project (2010, -) 2.3 Guanyinshan Coal Mine First Shaft Project (2010, -) 3. Xinjiang 3.1 Shuntong Coal Mine Renovation and Expansion Project (2010, -) 3.2 Huadian Changji Yingma Coal and Electricity Integrated Coal Mine (Phase I) Project (2010, -) 3.3 Xuxu Mining Ohobulake Coal Mine Technical Transformation Project (2010, -) 3.4 Xinjiang Kuqa County Jingou Coal Mine New Project (2010, -) 3.5 Xu Mining Group Saier Energy Well No. 3 Renovation and Expansion Project (2010, -) 3.6 New Luneng Zhundong Mine Project (2010, -) 3.7 Shizhuanggou Coal Mine New Construction Project (2010, -) 3.8 Quanshuigou Coal Mine Project (2010, -) 3.9 Shajihai Coal Mine Project (2010, -) 3.10 Annual Production 600,000 Ton Coal Mine Construction Project (2010, -) 3.11 Yili Panjin Coal Mine Project (2010, -) 3.12 Mesbulak Coal Mine Coal Preparation Plant Project (2010, -) 3.13 Annual Production 0.9MT Coal Mine Renovation and Expansion Project (2010, -) 3.14 Xiheishan Open-pit Coal Mine Project in Qitai County, Xinjiang (2010, -) 3.15 New annual washed raw coal 1.2MT/A heavy media coal washing project (2010, -) 3.16 Coal mine project with an annual output of 600,000 tons (2010, -) 3.17 New coal mine project with an annual output of 3 million tons (2010, -) 3.18 Mesbulak Coal Preparation Plant Project in Baicheng County (2010, -) 3.19 Wucaiwan Phase I open-pit coal mine project with an annual output of 1.5 million tons (2010, -) 3.20 Underground coal mine project with annual output of 3 million tons (2010, -) 3.21 Jianye Coal Mine annual output of 600,000 tons of raw coal construction project (2010, -) 3.22 20MT/A open-pit coal mine project (2010, -) 3.23 Hongshanwa Coal Mine reconstruction and expansion project (2010, -) 3.24 New Suhanghe Coal Mine Project (2010, -) 3.25 New Century Coal Mine Renovation and Expansion Project (2010, -) 3.26 Coal Mine Design Mining Project (2010, -) 3.27 Afangou Coal Mine Annual Production of 600,000 tons of Raw Coal Project (2010, -) 3.28 New Project of Mining 900,000 tons of Coal Mine (2010, -) 4. Sichuan 4.1 Jin'echi Coal Mine Project (2010, -) 4.2 Chuanjing Coal Mine Project (2010, -) 4.3 Coal Mine Integrated Technical Transformation Project (2010, -) 4.4 Chuanjing Coal Mine Construction Project (2010, -) 4.5 600,000 tons of mine and coal preparation plant project (2010, -) 4.6 Coal integration and expansion project with an annual output of 150,000 tons (2010, -) 4.7 Coal mine integration project (2010, -) 4.8 Coal mine integration and expansion project with an annual output of 150,000 tons (2010, -) 4.9 Coal mine integration project (2010, -) 4.10 Coal mine with an annual output of 90,000 tons* * Capacity expansion project (2010, -) 4.11 Coal mine integration project with an annual output of 90,000 tons (2010, -) 4.12 Coal mine integration project with an annual output of 90,000 tons (2010, -) 4.13 Coal mine capacity expansion project with an annual output of 90,000 tons (2010, -) 4.14 Coal plant expansion project (2010, -) 5. Shaanxi 5.1 Coal mine coal resource integration project (2010, -) 5.2 Annual output of 1.2 million tons of coal washing project (2010, -) 5.3 1.2 million tons/year coal washing plant construction project (2010, -) 5.4 Annual output of 5MT coal mine project (2010, -) 5.5 Hongliulin mine and coal preparation plant 12.0MT/A project (2010, -) 5.6 Shenfu Mining Area Shiyaodian Coal Preparation Plant Project (2010, -) 5.7 6.0MT/A Mine and Coal Preparation Plant Project (2010, -) 5.8 Coal Resource Integration Project (2010, -) 5.9 Annual Production 0.30MT Coal Mine Technical Improvement Project (2010, -) 5.10 Shenmu Xiangxianghe Mine and Coal Preparation Plant Project (2010, -) 5.11 Annual Production 0.45MT Coal Mine Coal Resource Integration Project (2010, -) 5.12 New Zhugeta Coal Mine Project (2010, -) 5.13 Bulianta Coal Preparation Plant Technical Transformation Project (2010, -) 5.14 New Mine and Coal Preparation Plant Construction Project (2010, -) 5.15 Guojiawan Coal Mine Supporting Coal Preparation Plant Project (2010, -) 5.16 Annual Production 0.60MT Coal Resource Integration Project (2010, -) 5.17 New Xiwan Open-pit Coal Mine Project (2010, -) 5.18 Annual Production 0.21MT Coal Mine Coal Resource Integration Project (2010, -) 5.19 Coal resource integration project with an annual output of 1.2MT (2010, -) 5.20 Coal resource integration project with an annual output of 0.15MT (2010, -) 5.21 Coal resource integration project with an annual output of 0.3MT (2010, -) 5.22 Coal resource integration project with an annual output of 0.6MT (2010, -) 5.23 New Xiaojihan coal mine shaft project (2010, -) 5.24 New Zhugeta coal mine project (2010, -) 5.25 Annual output 1.5MT coal resource integration project (2010, -) 5.26 Annual output 150KT coal mine resource integration implementation project (2010, -) 5.27 New coal preparation plant construction project ((2010, -) 5.28 New construction project of coal mine with annual output of 1.2MT (2010, -) 5.29 Coal resource integration project with annual output of 0.6MT (2010, -) 5.30 Shenhua Shendong Jinjie Coal Mine 15.0MT/A expansion project (2010, -) 5.31 Qinglongsi Coal Mine (3.0MT/A) and supporting coal washing plant project (2010, -) 5.32 New mine and coal preparation plant project (2010, -) 5.33 Guojiawan Coal Mine (8.0MT/A) and supporting projects (2010, -) 5.34 New Hongliulin Coal Mine Project (2010, -) 5.35 New Xiaojihan Coal Mine Project (2010, -) 5.3610.0MT/A Coal Mine Mining Project (2010, -) 5.37 Daliuta Coal Mine Sanpan Area Open-pit Mining Project (2010, -) 5.38 Shaanxi Coal Group Huangling Mining Area Jianbei Coal Mine Project (2010, -) 5.39 Guojiahe Coal Mine Project (2010, -) 6. Shanxi 6.1 Coal mine project with an annual output of 3 million tons (2010, -) 6.2 Taigang Yuanjiacun Iron Mine Project (2010, -) 6.3 Yuxi Coal Mine and Coal Preparation Plant Project (2010, -) 6.4 Chiyu Coal Mine Project Coal Preparation Plant Project (2010, -) 6.5 Chiyu Coal Mine Mine Project (2010, -) 6.6 Xishangzhuang Coal and Electricity Integrated Coal Mine and Coal Preparation Plant Project (2010, -) 6.7 Sunjiagou Coal Mine Renovation and Expansion Project (2010, -) 6.8 Xiaojiawa Coal Mine Project (2010, -) 6.9 Coal Mine Supporting Coal Preparation Plant Project (2010, -) 6.10 Shuniugou Coal Mine Project (2010, -) 6.11 Baode Wangjialing Coal Mine Comprehensive Project (2010, -) 6.12 Dongda Coal Mine Coal Preparation Plant Project (2010, -) 6.13 Coal Mine Renovation and Expansion Project with an Annual Production of 900,000 tons (2010, -) 6.14 Coal Mine Renovation and Expansion Project with an Annual Production of 2.1 million tons (2010, -) 6.15 Gaojiazhuang Coal Mine Project (2010, -) 6.16 Datongdi Coal Dongzhouyao Coal Mine Project (2010, -) 6.17 Dayang Coal Mine Branch 900,000 tons/year coal preparation plant project (2010, -) 6.18 Hexi Coal Mine reconstruction and expansion project (2010, -) 6.19 Maidizhang Coal Mine Project (2010, -) 6.20 New Jinyuan Coal Mine Supporting Coal Preparation Plant Project (2010, -) 6.21 Lingchuan County Sucun Coal Mine 600,000-ton mechanization upgrading and reconstruction project (2010, -) 6.22 Jinyuan Coal Mine and Coal Preparation Plant Project (2010, -) 6.23 Hexi Coal Mine 3 million T/A reconstruction and expansion project (2010, -) 6.24 New Jinyuan Coal Mine Project (2010, -) 6.25 New Qinglongsi Coal Mine and supporting projects (2010, -) 6.26 New Dongda Coal Mine Coal Preparation Plant Project (2010, -) 6.27 Xiegou Coal Mine Coal Preparation Plant Waste Discharge System Project (2010, -) 6.28 New Dongda Coal Mine Mine Project (2010, -) 6.29 Huajin Coking Coal Wangjialing Coal Mine Project (2010, -) 6.30 Xishan Jinxing Xiegou Coal Mine Project (2010, -) 6.31 Yangquan Xinyuan Coal Mine (2010, -) * * Key Project) Phase II Project (2010, -) 6.32 New Yuxi Coal Mine Project (2010, -) 6.33 Zhangcun Coal Mine Mechanized Caving Face Upgrading Project (2010, -) 6.34 Dongda Coal Mine 5 million tons/year mine supporting coal preparation plant project (2010, -) 6.35 Dongda Coal Mine 5 million tons/year mine project (2010, -) 6.36 Coal mine reconstruction and expansion project (2010, -) 6.37 Zuoquan Shigang Coal Mine (900KT/A) technical transformation project (2010, -) 6.38 Coal Mine 900KT/A upgrading and renovation project (2010, -) 6.39 Wangjialing Coal Mine 6 million tons coal preparation plant project (2010, -) 6.40 Wangjialing Coal Mine annual mining 6 million tons of raw coal project (2010, -) 6.41 Annual output 5 million tons coal mine and coal preparation plant new project (2010, -) 7. Shandong 7.1 Jiaojia 1,000 tons/day gold concentrate cyanidation plant project (2010, -) 7.2 Coal chemical park construction project (2010, -) 7.3 Coal gangue comprehensive utilization thermal power project (2010, -) 7.4 100,000 tons/year coke oven gas to methanol project (2010, -) 7.5 Coal mine technological transformation project (2010, -) 7.6 Wanfu Mine Supporting Coal Preparation Plant Project in Juye Mining Area (2010, -) 7.7 New Yongsheng Coal Washing Plant Project (2010, -) 7.8 New Shanxian Zhangji Coal Mine Project (2010, -) 8. Ningxia 8.1 Hongliu Mine and Coal Preparation Plant Project (2010, -) 8.2 Maiduoshan Mine Project (2010, -) 8.3 Coal mine and coal preparation plant construction project (2010, -) 8.4 Hongshiwan Coal Mine Project (2010, -) 8.5 Hongliu Mine and Coal Preparation Plant New Construction Project in Yuanyanghu Mining Area (2010, -) 9. Inner Mongolia 9.1 Meilinmiao Coal Mine Project with an annual output of 10 million tons (2010, -) 9.2 Chahasu Mine and Coal Preparation Plant Project (2010, -) 9.3 China Resources Power Wuguanfang Coal Mine (Phase I) Project (2010, -) 9.4 Yimin Hedong Mining Area No. 1 Coal Mine Project (2010, -) 9.5 Wangjiata Mine Project (2010, -) 9.6 Ordos 3 million tons/year dimethyl ether project coal mine project (2010, -) 9.7 Yangjiacun mine project (2010, -) 9.8 Baiyinchagan coal mine annual output 600,000 tons coal mine reconstruction and expansion project (2010, -) 9.9 Open-pit coal mine new project (2010, -) 9.10 Ordos coal mine project with an annual output of 3 million tons of dimethyl ether (2010, -) 9.11 Coal mine technical transformation and expansion project (2010, -) 9.12 Lijiahao Coal Mine Coal Preparation Plant (12.0MTA) project (2010, -) 9.13 Mining 0.45MT coal mine technical transformation project (2010, -) 9.14 Yimin Hedong No. 1 Mine with an annual output of 5 million tons coal mine project (2010, -) 9.15 Coal Mine Coal Preparation Plant Project (2010, -) 9.16 Tanggongta Coal Mine Renovation and Expansion and Supporting Coal Preparation Plant Project (2010, -) 9.17 Shengli East No. 2 Open-pit Coal Mine (Phase I) Project (2010, -) 9.18 Yuanhe Wuyoute Coal Mine Construction Project (2010, -) 9.19 Glassgou Coal Mine and Coal Preparation Plant Project (2010, -) 9.20 Bayan Baolige Coal Mine Project (2010, -) 9.21 GCL Company Bayan Baolige Coal Mine and Coal Preparation Plant Project (2010, -) 9.22 New Wantugou Coal Mine Project (2010, -) 9.23 Dongping Coal Mine and Coal Preparation Plant Project (2010, -) 9.24 Heichengzi Coal Mine Construction Project (2010, -) 9.25 Dongping Coal Mine and Coal Preparation Plant Project (2010, -) 10. Liaoning 10.1 Hujiamiaozi Iron Mine (Phase II) Project ((2010, -) 11. Beijing and Tianjin 12, Jiangxi 12.1 New Bayangole Mine and Coal Preparation Plant Project ((2010, -) 12.2 New Coal Blending Center Project (2010, -) 13. Jiangsu 14, Jilin 14.1 Coal mine resource development and construction project (2010, -) 14.2 Coal mine technical transformation project with an annual output of 50,000 tons (2010, -) 14.3 Mining of 60,000 tons of coal (2010, -) 14.4 60,000 tons of coal project with an annual output (2010, -) 14.5 Jixin coal mine reconstruction and expansion project (2010, -) 15. Hunan 15.1 Luchong-Tiexi Mining Area Tudong Mine Field Open-pit Stone Coal Mine Phase I Project (2010, -) 16. Hubei 16.1 Coal Mine with an Annual Production Capacity of 60,000 tons Technical Transformation Project (2010, -) 16.2 Coal Mine Safety Technical Improvement Project with an Annual Production of 90,000 tons (2010, -) 16.3 Yuancang Coal Mine Safety Transformation Project (2010, -) 16.4 Hongjiazui No. 1 Coal Mine Safety Renovation Project (2010, -) 16.5 Jianshi County Gemapao Coal Mine Safety Renovation Project in 2009 ((2010, -) 16.6 Coal Mine 2009-2010 Safety Renovation Project (2010, -) 16.7 Annual Coal Mine 90KT Capacity Expansion Technical Renovation Project (2010, -) 17. Henan 17.1 Liliangdian Coal Mine Project (2010, -) 17.2 Pingyu Coal and Electricity No. 9 Mine Project (2010, -) 17.3 Coal Washing 900,000 Ton Coal Preparation Plant Project (2010, -) 17.4 3.00MT/A Coal Preparation Plant New Construction Project (2010, -) 17.5 Huishuting Coal Mine Mining Plan Adjustment Project (2010, -) 17.6 600,000 tons of coal washing project (2010, -) 17.7 Zhengzhou Coal Group Co., Ltd. Coal Washing Plant Construction Project with an annual output of 3 million tons (2010, -) 17.8 Wangxingzhuang Coal Mine Storage and Shipping System and Coal Washing Plant Construction Project (2010, -) 17.9 3.00MT/A coal preparation plant construction project (2010, -) 17.10 Coal mine project with an annual output of 450,000 tons (2010, -) 18. Hainan 18.1 Beiyi Ore Body Underground Iron Ore Mining Project (2010, -) 19. Guizhou 19.1 Bingba Coal Mine Project (2010, -) 19.2 Coal mine construction project with an annual output of 150,000 tons (2010, -) 19.3 Changyin Coal Mine's new 150,000 T/A project (2010, -) 19.4 Changganling 300,000 T/A coal mine project (2010, -) 19.5 Junfeng Panshui Coal Mine (Integration) Project (2010, -) 19.6 Pan County Baoqing Coal Mine Integration Project (2010, -) 19.7 Wenquan Town Pingtu Coal Mine Technical Improvement Project (2010, -) 19.8 Wenjiaba No. 1 Mine and Coal Preparation Plant (Phase I) Project (2010, -) 19.9 Coal Mine Integration Project (2010, -) 19.10 Mining 300,000 tons of coal mine project (2010, -) 19.11 Annual mining of 150,000 tons of coal mine project (2010, -) 19.12 Mutanba coal mine project (2010, -) 19.13 Annual output of 5 million tons of Qianbei thermal coal production base project (2010, -) 19.14 Sanyong Mine annual output of 300,000 tons of raw coal project (2010, -) 19.15 New Xintian Coal Mine (Phase I) Project (2010, -) 19.16 Feitian Mine and Coal Preparation Plant Phase I Project (2010, -) 19.17 Renhuai Changganling Coal Mine (300,000 T/A) Project (2010, -) 19.18 Dawan Coal Mine Technical Transformation and Capacity Expansion West Well Project (2010, -) 19.19 Tianwan Coal Mine annual output of 450,000 tons of raw coal project (2010, -) 19.20 Tiancheng Mine and Coal Preparation Plant Project (2010, -) 19.21 Miaoxin Coal Mine Project (2010, -) 20. Guangxi 20.1 600,000 tons/A coal mining technical transformation project (2010, -) 21. Guangdong 22, Fujian 22.1 Newly built Baisha Lufeng Coal Mine Project (2010, -) 22.2 Newly built Yuansha Coal Mine Project (2010, -) 22.3 Chiping Luceng Coal Mine Project with an annual output of 300,000 tons (2010, -) 22.4 Yuansha Coal Mine Project with an annual output of 300,000 tons (2010, -) 23. Anhui 23.1 Lilou Iron Ore Mining and Dressing Project (2010, -) 23.2 Huaibei Mining Yuandian No. 1 Mine Project (2010, -) 23.3 Qingdong Coal Mine Project (2010, -) 23.4 Annual 300,000 tons industrial coal briquette project (2010, -) 23.5 Suzhou Zongsheng Mining Co., Ltd. Qilusun Coal Mine Project (2010, -) 23.6 Datang Jixi Stone Coal Comprehensive Utilization Power Generation Project (2010, -) 23.7 Yangcun Mine and Coal Preparation Plant Project (2010, -) 23.8 Liudian Mine and Coal Preparation Plant Project (2010, -) 23.9 Xieqiao Coal Mine Safety Reconstruction Project (2010, -) 24. Zhejiang 25, Tibet 26, Shanghai 27, Qinghai 28, Heilongjiang 28.1 Xiangyang Mine and Coal Preparation Plant Project (2010, -) 28.2 Baoqing County Shuangliu Coal Mine Construction Project (2010, -) 28.3 Luneng Baoqing Coal and Electricity Integration Project (2010, -) 28.4 Open-pit coal mine project with an annual output of 11 million tons (2010, -) 28.5 600,000 tons of raw coal washing project (2010, -) 28.6 Luneng Baoqing Chaoyang open-pit coal mine project (2010, -) 29. Hebei 29.1 New coal washing project with an annual output of 300,000 tons (2010, -) 29.2 Project with an annual output of 8 million tons of raw coal (2010, -) 29.3 Liujialiang Coal Mine Upgrading Project (2010, -) 29.4 Project with an annual output of 300,000 tons of coal washing (2010, -) 29.5 Port Area Coal Terminal Phase III Project (2010, -) 29.6 Wu'an Coal Gangue Power Generation Project (2010, -) 29.7 Newly built coal washing project with an annual output of 300,000 tons (2010, -) 29.8 Jizhong Energy Fengfeng Group Coal Chemical Industry (Phase I) Railway Special Line Project (2010, -) 29.9 Chengzhuang Coal Mine Technical Transformation Project (2010, -) 29.10 Liujialiang Coal Mine Upgrading Project (2010, -) 29.11 Kailuan Guye coal gangue pit power plant project ((2010, -) 29.12 Annual output of 8 million tons of raw coal project (2010, -) 29.13 Annual output of 300,000 tons of coal washing project (2010, -) 29.14 Coal industry upgrade comprehensive automation transformation project (2010, -) 30. Gansu 184 30.1 Coal mine project with an annual output of 1.8 million tons (2010, -) 30.2 Mine and coal preparation plant project (2010, -) 30.3 Mine and coal preparation plant construction project (2010, -) 30.4 Coal mine open-pit mining project (2010, -) 30.5 Zhongmushan Danmachang General Coal Mine Renovation and Expansion Project (2009-2011, 55 million) 186 30.6 Huaneng Qingyang 12 million tons Hetaoyu Coal Mine Project (2010, -) 30.7 Maojiachuan Coal Mine Project (2010, -) 30.8 Huanxian Liuyuanzi Coal Mine Project (2010, -) 30.9 Tianzhu No. 3 Well 1.2 million tons/year coal preparation plant general contracting project (2010, -) 30.10 Ningzheng Coalfield Hetaoyu Mine and Coal Preparation Plant Project (2010, -) 30.11 Huaneng Gansu Zhengning Hetaoyu Mine and Coal Preparation Plant Project (2010, -) 31. Tianjin 31.1 Renovation and Expansion Project of Mining 90,000 Tons of Raw Coal per Year (2010, -) 31.2 Licun Mine 3# Coal Seam Gas Underground Drainage Project (2010, -) 31.3 Tianjin Port Nanjiang Port Area Shenhua Coal Terminal Phase II Project (2010, -) 32. Beijing 32.1 Renovation and Expansion Project of a Coal Mine with an Annual Output of 1.8 million tons (2010, -) 32.2 Mine and Coal Preparation Plant Project (2010, -) I hope that friends who make related equipment will have good harvests in 2010