HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions for accepting documents from foreign engineering companies

2010-02-02View Original

Thread Content

There is an increasing amount of cooperation with foreign companies at present. Let’s all summarize the points to keep in mind when receiving BEP files. (Primarily the differences in the connection between domestic and international areas)
Reply #22010-02-03
If the equipment is supplied by foreigners, the diagram showing the locations of the equipment’s ports will be the one indicated on the equipment assembly diagram; no separate diagram of port locations will be provided, nor will any diagram submitted by the Chinese side be accepted.
Reply #32010-02-04
2# sun0225 is a bit biased; most of our key equipment is purchased from abroad, and the position of the nozzles is adjusted by the supplier as needed, so basically the requirements can always be met.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.