HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

flat field

2010-03-02View Original

Thread Content

What are the requirements for backfilling large areas and large depths of earth and stone?
Reply #22010-03-03
I remember that the main requirement is that the backfill must be compacted to a certain height.
Reply #32010-03-03
This very simple book has it all
Reply #42010-03-03
This situation can be divided into many types. Generally, construction machinery is selected for layered backfilling based on the degree of compaction required by the design. The maximum thickness does not exceed 0.5 meters, usually around 0.25 to 0.3 meters. There are detailed requirements in the construction specifications.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.