HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the key points for starting the cycle machine?

2010-03-07View Original

Thread Content

What are the key points for starting the cycle machine?
Reply #22010-03-07
The key points for starting the cycle machine are:: 1. Check the oil level and oil quality of the crankcase. They should be normal and good. Open the cooling water valve and adjust the cooling water volume. 2. Close the inlet and outlet valves, and open the loop valve and vent valve. 3. Turn the machine for more than two turns. If there are no abnormalities, slightly open the inlet valve. After two replacements, close the vent valve. 4. Close the inlet valve, start the circulation machine, and adjust the circulating oil pressure. After the operation is normal, gradually open the inlet and outlet valves, and adjust the circuit valve according to the production load.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.