Foundation embedment plate

2010-03-07View Original

Thread Content

When setting the requirements, a situation arose: one end of the foundations for the horizontal tank and the heat exchanger is a sliding end, so it is necessary to request a embedment plate from the civil engineering team. Generally, the size of the embedding plate should be slightly larger than the bottom surface of the equipment legs and smaller than the top surface of the foundation. But is it acceptable if the embedding plate has the same size as the top surface of the foundation? What are the advantages and disadvantages of the two plate-burying methods for both the equipment and the foundation?
Reply #22010-03-09
Generally, the sliding end of a horizontal tank is on the support, not on the embedded parts. Generally, the size of the embedded parts is larger than the area of the contact surface between the support and the ground (sometimes the length and width of the embedded parts are also related to the foundation of the horizontal tank). :victory:
Reply #32010-03-11
Generally, the sliding end of a horizontal tank is on the support, not on the embedded parts. Generally, the size of the embedded parts is larger than the area of the contact surface between the support and the ground (sometimes the length and width of the embedded parts are also related to the foundation of the horizontal tank).
Reply #42010-03-11
As mentioned above, in general, the sliding end of a horizontal tank is located on the support, not on the embedded parts. Generally, the size of the embedded parts is larger than the area of the contact surface between the support and the ground (sometimes the length and width of the embedded parts are also related to the foundation of the horizontal tank). If the dimensions are the same, it is possible to consider enlarging the foundation design a bit; if the foundation cannot be enlarged, it is also feasible to appropriately reduce the size of the embedded components. Since a safety factor is added when calculating embedments and foundations, the dimensions can be adjusted to suit the site conditions.
Reply #52010-03-17
The size of the base cross-section can be equal to the area of the embedded components; during construction, concrete can be poured using methods such as openings.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.