Two considerations for the construction of liquid ammonia pipelines

2010-03-10View Original

Thread Content

I came across an article that mentioned two points to keep in mind when constructing liquid ammonia pipelines: 1.1.1.1. When connecting tee joints in the ammonia system pipelines, the branch pipes should be bent into an arc following the direction of the ammonia flow before welding. 1.1.1.2. Welding of ammonia system pipelines should be carried out at temperatures above 0°C; if the temperature is below 0°C, care should be taken to remove moisture and frost from the pipelines prior to welding. Let’s discuss the reasons for these two points!
Reply #22010-03-10
I think the first point mainly takes into account the stress corrosion issue in ammonia media; The second point is that the vapor pressure of ammonia-based media is relatively high, which helps to prevent dew formation and corrosion.
Reply #32010-03-10
We have never seen such provisions; as for the second point, it makes even less sense – pipelines generally need to be preheated before welding, so that there is no water vapor present

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.