What to do if the connection between two piles is tilted during driving

2010-03-17View Original

Thread Content

Newbie seeking advice: What should I do if the connection between two piles is tilted?
Reply #22010-03-19
Should the design be for friction piles or bearing piles? Are you referring to eccentricity in the pile connection? In other words, the verticality of the piles does not meet the design requirements, and whichever treatment method is chosen, it must be verified and approved by the design institute.
Reply #32010-05-09
In that case, it can only be treated as a discarded pile; usually, the pile is driven again in place or two additional piles are installed on either side of the original pile

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.