HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the key points of the overall control operations in delayed coking?

2010-03-18View Original

Thread Content

What are the key points for the overall control of delayed coking operations? In particular, what details should be paid attention to in the reaction section? I’d like to share some insights from those of us with more experience! ~
Reply #22010-03-18
What is master control? Please give an example!
Reply #32010-03-18
The reaction section primarily controls the reaction temperature and pressure; therefore, it is necessary to pay attention to the temperature of the furnace tubes, the temperatures at various points within the coke tower, the pressure at the top of the coke tower, and the height of the coke layer. The actual operations are basically carried out with these factors in mind
Reply #42010-03-26
Control the reaction temperature, pressure, and recycle ratio to maintain the three equilibria in the distillation column. The most important aspect is preventing coking in the heating furnace.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.