HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Does anyone know anything about the Zhoushan Refining and Chemical project?

2010-03-22View Original

Thread Content

I saw a report saying flexible coking is being used – is that accurate? Review meeting for the feasibility study report of Sinochem’s large-scale refining and chemical project in Zhoushan held in our city 2007-09-06 Source: “China Zhoushan” portal website From August 28 to 30, an expert review meeting for the “Feasibility Study Report on Sinochem Group’s 12 million tons per year refining and chemical project in Zhoushan” was held in our city. Nine senior petrochemical experts from the country, leaders from the Provincial Development and Reform Commission and the Provincial Environmental Protection Bureau, city ** leaders, as well as representatives from relevant departments in our city attended the meeting. The experts present inspected the two candidate sites, Xiaoguoju on Liuheng Island and Diaoliang on Zhoushan Main Island, and held serious and in-depth discussions and deliberations regarding the \"report\". The expert group believes that Sinochem’s proposal to use heavy and low-quality crude oil and employ flexible coking processes for processing is technically advanced, economically reasonable, and also conducive to energy conservation and environmental protection ; The proposed site in Xiaoguoju, Liuheng, has little impact on the urban area of Zhoushan and Zhoushan Airport; it is more conducive to connection with the Ningbo petrochemical industrial zone. There is an ample supply of land available there, and no farmland is occupied. The coastline is well integrated with the inland areas. With the completion of the cross-sea bridge from Liuheng to Ningbo, the strategic advantages of this location will become even greater. Therefore, choosing Xiaoguoju in Liuheng as the site is a reasonable decision ; Based on the current preliminary feasibility study report, it is necessary to further optimize various construction plans. At the same time, proper coordination and integration should be ensured among the plans for the Liuhegang Petrochemical Industry Base, land use planning, and port shoreline planning, with the aim of including them in the **12th Five-Year Plan for refining and chemical processing industries**.
Reply #22010-03-22
In the end, the delayed coking process was adopted, with two furnaces and four towers; the plant came online in 2008.
Reply #32010-03-22
The project remains on paper for now, with construction expected to begin in 2100.
Reply #42010-03-23
Zhoushan is an island, so environmental protection measures there are certainly stricter than on the mainland; the possibility of establishing large-scale oil refining projects there is low!
Reply #52010-03-24
Not clear:victory::victory:
Reply #62010-03-24
It’s been stopped, so there’s no need for anyone to worry!
Reply #72010-03-24
It’s unlikely within five years, unless the leadership of the city council is reelected. CNOOC Zhoushan Petrochemical is subject to various constraints, and the Tianlu project has also been changed to storage and transportation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.