What tonnage should the spring have during the heating up of a 5.5-meter coke oven?
Reply #22010-03-31
Check the design specifications; it should be there
Reply #32010-06-08
Is it a reinforced coke oven? Upper: 160-170 kn, Lower: 105-115 kn
Reply #42010-06-09
When drying ovens in our factory, we adjust according to the oven-drying plan formulated by experts, based on the different temperature ranges during the drying process.
Reply #52010-07-15
It is best to follow the parameters provided by the design institute
Reply #62010-08-24
The drawing design instructions should be included; adjustments should be made during furnace heating.
Reply #72010-08-25
Follow the furnace heating plan specifically.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.