HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily monitoring issues of a section of furnace conversion tube

2010-04-01View Original

Thread Content

Ours is a radiant furnace; to prevent the conversion tubes from overheating and exploding, we conduct inspections once per hour and measure the tube wall temperature twice a day at fixed times. What about your furnace unit – how is it maintained and monitored?
Reply #22010-11-11
Temperature difference: The temperature difference within the same plane of the furnace tubes should be less than 30 degrees, and within the same plane of the furnace chamber, it should be less than 50 degrees
Reply #32010-11-11
Inspections every hour, checks daily, and furnace tube temperature measurements monthly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.