This post was last edited by 18 on 2010-4-12 at 14:13. A “One Question per Day” activity is being held in the oil and gas sector; we hope all members will participate actively. What are the quality requirements for well killing during the maintenance of oil and water wells? To prevent some members from copying the answers of others, please hide your posts when answering questions. To hide the method, click here: Hide Method. The event lasts for 5 days, and the answer key will be released after 5 days.
This post was last edited by 18 on 2010-4-12 at 14:11 (1) Choose the drilling fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well control with no blowout and no leaks. (4) The mud shall not touch the ground, staying clean and free of debris.
Answer: (1) Select the drilling fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well killing without spraying or leakage. (4) The mud shall not touch the ground, remaining clean and free of debris.
(1) Select the drilling fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well killing without spraying or leakage. (4) The mud shall not touch the ground, remain clean, and free of debris
: (1) Select the drilling fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well killing without spraying or leakage. (4) The mud shall not touch the ground, remaining clean and free of debris.
Answer: (1) Select the drilling fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well killing without spraying or leakage. (4) The mud shall not touch the ground, remaining clean and free of debris.
1. Select the drilling fluid strictly in accordance with the design. 2. The amount of mud used is 1.5 times greater than the volume of the wellbore. 3. Well killing without spraying or leakage. 4. The well control fluid must not touch the ground, ensuring it remains clean and free of debris.
(1) Select the kill fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well control with no blowout and no leaks. (4) The mud shall not touch the ground, staying clean and free of debris.
(1) Select the kill fluid strictly in accordance with the design. (2) The amount of mud used is more than 1.5 times the volume of the wellbore. (3) Well control with no blowout and no leaks. (4) The mud shall not touch the ground, staying clean and free of debris. 1# 18th
1 Select the drilling fluid strictly in accordance with the design. 2 The amount of mud used is 1.5 times greater than the volume of the wellbore. 3. Well control: no blowout, no leakage. 4 Keep the mud fluid from touching the ground, maintain cleanliness, and ensure there are no debris.
This post was last edited by 18 on 2010-4-12 at 14:12: Unbroken by pressure, unspouting in life