HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How should the pressure drop for pressure testing be determined?

2010-04-07View Original

Thread Content

During pressure testing of equipment and pipelines, what is the allowable pressure drop?
Reply #22010-04-07
During the pressure test, the pressure is increased slowly to the test pressure and held at that level for 10 minutes; thereafter, the pressure is reduced to the design pressure and held there for 30 minutes. The test is considered successful if the pressure remains constant and there are no leaks. Therefore, the test pressure required for true compliance must be stable, with no significant variations. There should be basically no change on the dial, and the value of the change cannot be read directly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.