How to carry out design management after the project starts?
Design institutes play a very important role in project construction, ranging from the preliminary design of a project to its detailed design and then to the actual construction phase. It can be said that preliminary design management is very important, as it largely determines whether the project will proceed smoothly. Once the construction begins, the design enters the implementation phase, during which the design institute is mainly responsible for carrying out supplementary designs. For aspects that were not properly designed in the initial phase, or that do not match the actual conditions, new design drawings or design changes are issued. After resuming work, the management of the design should focus mainly on design changes or resolving actual problems on site. Ultimately ensure the smooth progress of the project construction
Design management after the project starts mainly involves design liaison and design coordination. And, based on the progress on site, arrange for designers to go to the site. If necessary, it is also required to go to the design institute to coordinate and resolve the issues. To do a good job in design management, in addition to the necessary professional knowledge, one must also have a high sense of responsibility; one should never act as a go-between.
Design is a complex process that requires collaboration, and it is best to use some collaborative design management software for this purpose. Such software should include functions such as real-time communication, coordination tools, forums, document management, progress tracking, and time tracking.