HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding welding issues?

2010-05-06View Original

Thread Content

Why are short pipe joints welded to some drum shells, and why are large holes made in those drum shells?
Reply #22010-05-08
It’s a counterbored hole! That’s why!
Reply #32010-05-10
I’m not quite sure about this either; you’d better check it out
Reply #42010-05-10
Then why are only boilers with a pressure of 3.82 MPa or higher like this?
Reply #52010-05-10
Plates thicker than 38 MM are not suitable for welding after heat treatment, and pipe fittings serve as a transitional element in this case!
Reply #62010-05-20
It certainly isn’t for spot welding, because it’s easier to weld if holes are made. Most Class B boiler manufacturers are reluctant to drill counterbore holes, as it’s not easy to do! They don’t have the equipment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.