HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the design of foundation pit excavation drawings

2010-05-13View Original

Thread Content

This post was last edited by zjsdbjj on 2010-5-13 at 15:11. I have just taken on a small chemical engineering project, and the client requested that the design firm provide drawings for pit excavation. However, one of our experienced civil engineering designers suggested that the drawings for pit excavation should be prepared by the construction party as part of their construction plan. I would like to ask everyone: who is actually responsible for providing the foundation pit excavation drawings??
Reply #22010-05-13
Provided by the construction contractor in the construction plan.
Reply #32010-05-17
Thank you, I know how to respond to the client now.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.