How many air caps are generally needed for a 200,000 tons/year boiling furnace?

2010-06-01View Original

Thread Content

I would like to ask the experts: In the design of a boiling furnace for producing acid from pyrite, how is the number of air nozzles determined? How many air nozzles are typically required for a boiling furnace with an annual production capacity of 200,000 tons? What is the general range for the spacing between the air nozzle holes in the deck?
Reply #22010-06-26
Generally, the spacing between air caps in domestic installations is 140 units, arranged in a triangular pattern; there are two concentric circles around them. Each air cap has 6 holes with a diameter of 4.7 units. As long as there are enough air caps, that’s sufficient. The diameter of a 200,000-ton sulfuric acid furnace is approximately 7,500 units, so the total number of air caps needed is around 2,400. It’s easy to find the relevant drawings.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.