HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Input conditions for the vent line determined

2010-06-06View Original

Thread Content

Recently, I was calculating the total vent pipeline for a large-diameter pipe, DN800; Many of the branch pipes on it come from different devices; I would like to ask some seniors the following questions: 1. With a main pipe of DN800, what size of branch pipes can be ignored? 2. Since the various branches originate from different devices, the input conditions they provide also vary. For example, the sequence of the branches is as follows: (1), DN250, temperature
Reply #22010-06-07
1. The main pipe is DN800; what size of branch pipes can be ignored? I think the temperature

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.