How to design the feed tank for a distillation tower?

2010-06-19View Original

Thread Content

I would like to ask everyone: How should the feed tank for a small continuous distillation column be designed? Thank you
Reply #22010-06-19
24-hour normal load capacity of the first directly related device downstream
Reply #32010-06-19
There are usually several options. The first is the 24-hour option mentioned in 2F; the second is 12 hours; the third is 8 hours. The second and third options are related to the factory’s shift schedule, whether it’s four shifts with three rotations or three shifts with two rotations. Of course, any choice regarding the duration of stay also needs to take into account the overall layout of the tank area and ensure overall coordination
Reply #42010-06-21
Got it, thank you both~~~

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.