HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The most convenient basic construction plan for small pump units

2010-06-24View Original

Thread Content

Simply install all the foundation feet of the pump directly, then set up formwork around the pump and add reinforcement bars; adjust the levelness of the pump, and carry out grouting in one go. This reduces the number of procedures, thereby lowering both costs and construction time
Reply #22010-06-29
This can be done once the equipment arrives on site, but in most projects, the equipment only comes with drawings of the base plate, so it is still necessary to pre-drill holes.
Reply #32010-06-30
Reply to 2# 41303: It’s good to be willing to think and take action; most people are only willing to think but not to act. If this approach is followed, damage to pumps can occur during construction, resulting in heavy losses.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.