HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Benzene washing tower – Packing installation method

2010-06-24View Original

Thread Content

What is the method for packing the fillers in a benzene washing tower?
Reply #22010-06-27
If it is bulk packing, fill it with water first before adding the packing; For *integral packing, it should be installed either as a single piece or in sections, depending on the tower diameter
Reply #32010-06-27
It depends on what kind of filler you are using; different fillers require different installation methods

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.