joint commissioning

2010-06-27View Original

Thread Content

1. Purpose of joint commissioning: The purpose of joint commissioning is to verify whether the performance and quality of the equipment, pipelines, valves, electrical systems, instruments, computers, etc. in the installation meet the requirements of the design and specifications. 2. The contents of the joint commissioning include: instrument coordination testing of the system, water circulation, airtight replacement of the equipment, system drying, hot and cold oil circulation, heating furnace drying, and filling with the three types of agents. Generally, it should start with a single system, and then expand to the coordinated operation of several systems or the entire installation. During the joint commissioning process, instruments that are not affected by process conditions, as well as protective interlocks and alarms, should all be involved in the testing, and the automatic control system should be put into use gradually.
Reply #22013-03-12
Could you provide a summary of the joint test run? Thank you

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.