HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of armored cables on-site

2010-06-29View Original

Thread Content

The petrochemical industry is increasingly leaning towards using armored cables, but the connection from the instruments to the cable trays has become a point of debate. According to the typical diagrams in the installation manuals, some believe that there is no need for flexible pipes or protective tubes; instead, a smaller cable tray can be connected from the main cable tray to the location where the instrument is located, and the cable can then be laid there, with angle steel used for support along the way. What are everyone’s opinions on whether cable protection tubes are still necessary these days?
Reply #22010-06-29
The protective tube is still necessary; it also serves to provide equipotential connection, so it cannot be omitted.
Reply #32010-06-29
Armored cables do not require flexible tubes; protective tubes are still used

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.