Thread Content

During the equipment manufacturing process, how is the quality and schedule of the equipment controlled? The more detailed, the better
Reply #22010-06-30
Key points must be strictly controlled, such as raw material inspection, material re-inspection, heat exchange tube inspection, non-destructive testing, and pressure testing
Reply #32010-07-01
Let the manufacturer in charge supervise to ensure fast and high-quality work
Reply #42010-07-01
Reply to 2# Little Pig is Not Lazy. Thank you.
Reply #52010-07-02
I work in design; I like to go to the manufacturing site, hold the blueprints, and look at the equipment – by doing that, I end up feeling confident
Reply #62010-07-02
Reply to 5# gaomm1987, thank you

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.