HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Boiler bidding

2010-07-01View Original

Thread Content

What should be noted when bidding for boilers only the main unit?
Reply #22010-07-01
Found on Baidu; hope it will be helpful to you. During the bidding process for CFB boilers, when specifying technical requirements, the owner should pay attention to factors such as the boiler’s capacity, the type of coal used for combustion, the external environment in which the boiler operates, the operating conditions, and the performance requirements of the boiler, so as to make a more rational choice regarding the boiler to be selected. http://www.cqvip.com/QK/98065A/2004002/9996072.html Wishing you success
Reply #32010-07-08
The boiler itself should be selected based on the local coal quality, while also ensuring the boiler’s output capacity.
Reply #42010-07-08
Heat load, fuel, furnace type, environment, volume, pressure, temperature.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.