Thread Content
What should be considered when drawing instrument installation diagrams? In particular, the transmitter installation diagram
What? Have you just started designing? When drawing any kind of blueprint, it’s crucial to avoid purely theoretical approaches; make sure to visit the site more often and seek advice from experienced workers!
I’ve just started working in design and need to prepare for a probationary review, and we rarely have the opportunity to learn on-site!* I don’t know where to start with this
I’ve just started working in design and need to prepare for a probationary review, and we rarely have the opportunity to learn on-site!* I don’t know where to start with this
Take a look at the transmitter selection guides; they usually include instructions on installation, and you can simply follow those diagrams. The installation documents from design institutes are generally not provided to users in electronic format.
This **control center station does have a fairly standard ‘Control Installation Manual’ for reference; the latest version was released last year. However, it seems that the electronic version is not available online yet – it’s quite expensive, probably to protect copyright. The original poster can refer to the 1995 edition of the Control Installation Manual, as it also contains very detailed information, including thorough descriptions of pressure transmitters and differential pressure transmitters, along with clear illustrations. Highly recommended!
Oh, okay, thank you. I still need to learn more from the seniors*
The first half of the Control Installation Manual 2010 edition is already available on Haichuan; I have downloaded it. Go and search for it yourself.
Reply to 7# Jing'er: I’ll prepare a few pictures and send them to you tomorrow