Asking for help, sea friends: Can oil and gas sites process tees by themselves? Are there any relevant standards or regulations in the industry?

2010-07-06View Original

Thread Content

Our company has long been unable to reach a consensus on whether we can make our own tees in dangerous oil and gas locations, and the on-site practices are quite confusing. I think that when some low-pressure pipe sections are connected and the working medium is weakly corrosive, you can consider processing the tee by yourself, but for high-pressure and highly corrosive media (such as: (Working pressure above 7MPa, places containing sulfur and high chloride ions, etc.) It is not recommended to use homemade tees. Custom-made tees should be made. Is my opinion correct? Welcome all friends to discuss it. Thank you in advance!
Reply #22010-07-06
Low-pressure and non-corrosive parts can make homemade tees, but high-pressure or severely corroded or highly toxic media are not allowed.
Reply #32010-07-06
I checked a lot of information, but I don’t seem to see relevant specifications or regulations, such as the "Petrochemical Plant Process Pipeline Installation Design Manual", and there are no relevant regulations.
Reply #42010-07-06
The regulations on gas pipelines seem to be that those larger than 0.5 times the diameter of the main pipe need to be equipped with tees, and the rest need to be reinforced. I don’t know what homemade tees mean?
Reply #52010-07-06
The self-made tee means that the tee is processed by oneself on site
Reply #62010-07-06
Let me tell you clearly that high voltage is absolutely not allowed. Low voltage must meet the standard requirements before it can be produced on site. However, most sites do not have corresponding detection and testing equipment, so it is not recommended.
Reply #72010-07-06
If enough reinforcement is done, it should be okay, but obviously low voltage is safer! Even if reinforcement is not done, it is difficult to say about the high pressure, especially where the construction quality is not guaranteed, but the finished product is guaranteed! I * Because all our pipes are low-pressure pipes, basically 1.6MPa and below, we tend to open tees ourselves. We use the hole pulling machine.
Reply #82010-07-07
It seems that everyone still has a consensus that low-pressure processing is conditional, but high-pressure processing is not recommended. I wonder if there are any processing technical requirements or specifications!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.