At present, the basic facilities such as dormitories and canteens have been built and are ready for use. The equipment for Phase 1 has been ordered, and it is said that 80% of the civil engineering work will be completed by August
It’s not that fast, right? 5.5 billion cubic meters of natural gas – a very large project.
Haha, what a great place! Where do you want to go?
The first-phase project shouldn’t be that large; it’s estimated to be around 2 billion
Phase 1 of the project has a capacity of 1.3 billion cubic meters per year!
To be precise, it is the Phase 1 project with a volume of 1.375 billion cubic meters, requiring an investment of 7.5 billion yuan
As long as the funds are available, the pace of work will be ensured. Can construction and installation take place in Xinjiang’s winter?
Reply to 8# hibbs707: Winters in Xinjiang are around minus 20 degrees Celsius, so it’s not suitable for carrying out construction work. Of course, this is different if heating is used. In northern Shaanxi, there was a chemical plant that used heaters to keep the work area warm during winter in order to meet deadlines
In July, our friend went to the Qinghua site, and there was no activity at that time.
Reply to 10# kkxxzyb: There have been significant changes since October; the living area is almost complete, and the equipment installation phase has begun in the installation area. It gives an impression of being very grand