HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Condenser outlet pipeline drain

2010-07-20View Original

Thread Content

This post was last edited by Shandong Huaxing on 2010-7-20 21:22. There is no blowdown valve on the condenser outlet pipeline. How to confirm that the sulfur is removed during flue gas purging? Do you have a blowdown valve on your condenser outlet line? The drain valve needs to be heated, right? Will it get clogged frequently?
Reply #22010-07-20
This post was last edited by Shandong Huaxing on 2010-7-20 21:22. Under normal circumstances, the condenser must be equipped with a sewage discharge device so that it can be used when the device is shut down or operating abnormally. Sewage discharges are usually jacketed pipes, otherwise they are prone to blockage.
Reply #32010-07-20
This post was last edited by Shandong Huaxing on 2010-7-20 21:23. After purging, it is generally necessary to take samples and analyze the sulfur content, etc., by a specialized laboratory department.
Reply #42010-07-20
This post was last edited by Shandong Huaxing on 2010-7-20 21:23 We usually check the liquid sulfur through the sulfur seal window to see if there is no liquid sulfur coming out. If it does not come out, it means that the liquid sulfur in the flow condenser has been drained!
Reply #52010-07-20
This post was last edited by Shandong Huaxing on 2010-7-20 21:24 and replied 4# weihua110 Is this a thorough way to eliminate sulfur? Have there been any problems? To wait for the sulfur seal to overflow and release the sulfur, there must be more liquid sulfur in the system! I think you should purge for a few more hours after no sulfur flows out.
Reply #62010-07-20
This post was last edited by Shandong Huaxing on 2010-7-20 21:24. It is the same as what was said on the second floor. In the early stages of construction, where did the dirty sulfur you just produced go? Our basics are from this place. Jacket heating is generally used to prevent valve jamming. actively participate
Reply #72010-07-21
This post was last edited by Shandong Huaxing on 2010-7-21 22:14 and replied to 5# guiran2006 We are generally like this. Of course, there may be other operations in which I am not present. I'll ask someone else to confirm it!
Reply #82010-07-21
Remember to heat the sewage outlet to the outermost end of the outlet to prevent the sewage outlet from being blocked due to low temperature in places where the heat cannot be traced.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.