HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

During the start-up of the methanol wash unit, the crude gas/lean gas heat exchanger is not in use; how can the gas be cooled to the required temperature?

2010-07-21View Original

Thread Content

During the start-up of the methanol wash unit, the crude gas/lean gas heat exchanger is not in use; how can the gas be cooled to the required temperature?
Reply #22010-07-21
Our feed gas cooler is a shell-and-tube heat exchanger used for heat exchange between the reformate gas and the purified gas, CO2 gas, as well as the exhaust gas. Methanol cooling begins immediately after a circulation system is established prior to startup; at this point, two streams of material are used to pre-cool the feed gas cooler. Gas nitrogen is introduced 30 minutes before startup, and a third stream of material is used for pre-cooling the feed gas cooler. In this way, as the system continues to cool down after gas is introduced, the raw gas is cooled to the required temperature.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.