HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Discharge of wastewater

2010-07-29View Original

Thread Content

There is an existing chemical plant whose wastewater has a pH of 3–4. The wastewater volume to be discharged is as follows: 100 cubic meters per 8 hours over a distance of 2500 meters; 300 cubic meters per 8 hours over a distance of 400 meters; and 400 cubic meters per 8 hours over a distance of 600 meters. To discharge this wastewater, 3500 meters of piping is required. It is planned to use PPR pipes for this purpose, and the appropriate pipe diameter and the rationale behind it are under discussion.
Reply #22010-07-31
This is a problem related to the selection of economic pipe diameter; it is first necessary to understand the discharge pattern of each unit volume of wastewater, as well as the maximum, average, and minimum flow rates; Then select the fill degree, taking into account pipe layout, shaft arrangement, design flow velocity, and pipe diameter.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.