Let’s talk about the instrument layout diagram

2010-07-31View Original

Thread Content

First of all, I’m a beginner... On the layout diagram, which lines should be kept and which ones should be removed? I’m a bit confused. Also, what should I pay attention to when drawing the instrument layout diagram?
Reply #22010-07-31
I usually delete all the elevations; sometimes I also remove the equipment tag numbers, the equipment centerlines… and so on
Reply #32010-07-31
I noticed that in some colleagues’ layout drawings, the center lines haven’t been removed, but annotations such as distances to columns and equipment have been deleted; I didn’t pay attention to anything else. Has anyone seen the regulations regarding how to draw these diagrams? Sharing this, thank you so much!
Reply #42010-08-01
No. It is based on the principle of displaying cleared gauge information.
Reply #52010-08-01
Reply to 4# backhamm1982: Could you be more detailed? Thank you!
Reply #62010-08-01
It's sufficient to clearly indicate the relative positions of the instruments; unnecessary process pipelines and equipment can be removed. It’s the instrumentation specialists who decide on the instrument drawings, hehe.
Reply #72010-08-01
I don’t know what major the original poster has. I major in instrument control. When drawing instrument layout diagrams, if there isn’t too much content on the sheet and the instruments can be clearly shown, we try not to remove any elements from other specialties. If it’s really impossible to fit everything in, then we can make appropriate adjustments by altering or removing elements from other specialties, as long as this doesn’t affect readability or the overall clarity of the diagram.
Reply #82010-10-21
The location icon I see is still tall.....
Reply #92010-10-22
If you are not from a design institute, you don’t need to provide site plans; you can simply have the installation company review the PID diagram while you provide on-site guidance for the installation!
Reply #102010-10-24
The instrument layout diagram is provided by the process engineering team, right?
Reply #112010-10-25
? ? ? ? Why can’t I see the image?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.