HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Aspen is showing confusing errors

2010-08-12View Original

Thread Content

Block: B9 Model: HEATX * WARNING: The calculated feed temperature for the hot side (3.6603439D+02) does not match the value of its inlet stream (3.3613543D+02). Probable cause: An upstream block with different NPHASE or PROP settings; the calculated value will be used in the calculations for this block
Reply #22010-08-12
I didn’t encounter any errors when using the simple model at first, but such errors appeared when I used water for cooling; I’m not sure why.
Reply #32010-08-13
Reply to 2# superyj: Please post the bkp

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.