What are the consumption metrics for water, electricity, and coal in the production of sulfur-based compound fertilizers?

2010-08-15View Original

Thread Content

As stated in the title, it produces general-purpose fertilizer with a concentration of 45–48%. Thank you all for your guidance!
Reply #22010-08-18
Reply to 1# Satan’s Paradise: It’s difficult to provide an exact figure, as different manufacturers have different settings, which results in varying consumption levels during the production process.
Reply #32010-08-20
It is roughly as follows: low-pressure steam at 50 kg/ton, fuel gas at 11.5 m³/ton, electricity at 41 kWh/ton, and process water at 0.15 m³/ton. Just convert the fuel gas into coal by yourself.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.