HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Treatment at the junction outside the newly constructed pavement and the tank farm cofferdam~

2010-08-19View Original

Thread Content

This post was last edited by phlyman on 2010-8-19 at 17:13. I am a specialist in structural engineering, and I am working on a new tank farm project. The question I have is: how should the junction between the perimeter dike of the tank farm and the road be handled?
Reply #22010-08-19
In the past, green landscaping was used, but nowadays gravel paving is more common, with a thickness of about 10–15 centimeters.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.