HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Annual consumption and maximum reserves

2010-08-23View Original

Thread Content

May I ask everyone, can the annual consumption of raw materials and auxiliary materials for the project be less than the maximum storage capacity?
Reply #22010-08-24
It should be possible. Such as relatively scarce raw materials. However, it is generally not advisable to use bulk raw materials that are easily available, as this can result in the annual consumption of materials for the project being less than the maximum available stock. This not only consumes a large amount of funds but also increases management costs and certain levels of consumption, often making the cost higher than that of purchasing the materials directly.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.