HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to evaluate the capabilities of a project manager in a design institute.

2010-08-24View Original

Thread Content

Friends, how can we assess the capabilities of a project manager in a design firm? Besides looking at their performance and their ability to communicate with clients, are there any other ways?
Reply #22010-08-25
In addition to the performance and communication skills mentioned by the original poster, it is also necessary to consider the project manager’s ability to take overall control and their comprehensive coordination skills. For one of our previous projects, due to the lack of unified standards, the guardrails in the installations used either national standards or institutional standards; the stairs and platforms were equipped either with grating panels or patterned panels. As soon as the plumbing team finished installing the underground pipelines, the civil engineering team made changes, requiring the pipelines to be dug out again for reinstallation. The emergence of problems like these is all the fault of incompetent project managers.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.