HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking advice on stress analysis issues

2010-08-30View Original

Thread Content

In pipeline stress analysis, some piping systems are quite complex. My colleagues said that fixed points should be established to break down the piping system into several simpler pipelines before conducting the analysis, but I still don’t know how to set up those fixed points I’d like to ask everyone for advice
Reply #22010-08-30
This depends on the specific circumstances; setting fixed points in complex systems is a systems engineering task that requires extensive design experience. I’m not very experienced in this area; I hope some experts with more experience can provide some insights, hehe
Reply #32010-09-02
The same question: can the fixing points at the pump’s outlet and inlet be fixed completely, just like those at the equipment ports?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.