HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

∏Position of the curved guide bracket

2010-08-31View Original

Thread Content

∏How is the position of the bend guide support usually determined? One approach is to place the guide right near the elbow of the ∏ bend; some books require that there be at least 40D between the elbow and the guide. Personally, I think the latter approach is better. Please share your opinions
Reply #22010-09-01
Generally, we add guidance at the nearest support near the elbow; if high forces are detected, we just leave some clearance. The value of 40D is probably an empirical value from the era when calculations were done manually
Reply #32010-09-03
40D is not absolute; as long as it can be calculated, the displacement remains within the allowable range. Everything is OK
Reply #42010-09-04
It’s 40D – the experience value can be determined based on the surrounding conditions. The same principle applies to the nearest support mentioned earlier; it depends on your pipe diameter and span length
Reply #52010-09-07
This is specified in the standards for petrochemical pipeline layout; it should be set at 30–40DN. I think the results obtained using CAESAR are, after all, not entirely accurate in reality. When using CAESAR to calculate for an “L” shape with a long arm of 100m and a short arm of 50m, it is still possible for it to work; however, such designs are rarely implemented in actual engineering projects. After all, the values of 30–40 DN are the result of long-term experience and calculations.
Reply #62010-09-25
Personally, I think it’s necessary to conduct an analysis based on the actual conditions. However, in practical calculations, for pipes with a larger diameter and higher temperature, I choose a range of 35D to 42D along with the use of a first guide frame, and this approach works well in real applications.
Reply #72013-07-10
In that case, for a DN100 pipe, the extension of the arm is 40 times the DN value, which equals four meters. The distance between the two guide supports is too long; how many sliding supports are needed?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.