Thread Content
Does anyone know which design institute was responsible for designing the 2 million tons per year synthetic ammonia and 3.5 million tons per year urea project of China National Coal Group in Ordos Tuk, and what is the progress of this project?
Coal crushing pressurized gasification by Saiding Engineering Co., Ltd. (formerly the Second Chemical Research Institute).
Could you explain the specific manufacturing process?
Tianchen is responsible for the design except for urea and gasification, while Saiding is in charge of gasification
How is the schedule? What about these substantial future profits and market conditions?
Complete the preliminary design by the end of September, and finish the bidding process before the end of the year
Weren’t we saying EPC general contracting? Was it decided to assign the general contracting to that design firm?
Such large-scale installations generally use low-temperature methanol washing for desulfurization and decarbonization, while sulfur recovery is achieved through the Claus process or the wet sulfuric acid production method.
Tendering has been launched for the construction of administrative and living facilities in the pre-plant area of the Ordos Tuk Industrial Project, which is designed to produce 2 million tons of synthetic ammonia and 3.5 million tons of urea per year. I. Scope and content of the tender: The construction of administrative and living facilities in the pre-plant area includes: office buildings, dormitory buildings, canteens, badminton courts, as well as guest houses. The office building has four floors above ground, with a height of 18.6 meters and a total construction area of 21,328 square meters ; The cafeteria and badminton court have 2 floors above ground and 1 floor below ground; the building’s height is 14.1 meters, with a total construction area of 4,797 square meters ; The dormitory building and guest house have 5 floors; the building height is 16.8 meters, and the floor area is 22,442 square meters ; The outdoor pipeline network project connected to the aforementioned main building. II. Project duration: April 5, 2011---July 31, 2011