HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to stabilize the methanol cooling capacity during systematic cyclic cooling?

2010-09-15View Original

Thread Content

Our plant uses a six-tower process for low-temperature methanol washing; what conditions must the system meet when the C-4 tower (i.e., the regeneration tower) is put into operation? How should I operate under the current conditions (system cyclic cooling)?
Reply #22010-09-16
1. First, the methanol cycle has been established. 2. The refrigeration system is operating normally, and the methanol circulation for cooling has already begun. 3. The thermal regeneration tower can be put into operation when the temperature entering it is around 10 degrees. 4. The methanol-water separation tower can be put into use after the thermal regeneration tower is in operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.