HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In dry quenching of coke production, why is the pressure in the pre-storage chamber still over -150 even when the furnace lid is not opened?

2010-09-16View Original

Thread Content

In dry quenching of coke production, why is the pressure in the pre-storage chamber still over -150 even when the furnace lid is not opened? Sometimes it’s around -200 as well; the value becomes even more negative after opening the furnace lid.
Reply #22010-11-13
When the system pressure is unstable, do not switch to automatic mode for the pre-chamber pressure control valve; instead, make small manual adjustments, adjusting the valve by 0.2–0.5 increments at a time, and only switch to automatic mode once the pressure becomes stable. If the pressure fluctuations are too large, the waste guide opening can be increased.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.