HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Feasibility study on a 100m long factory building

2010-09-25View Original

Thread Content

I have been drawing diagrams in the past but have no experience with feasibility studies. I now have a project to take on, which is in the feasibility study and design phase; it involves a factory building approximately 100 meters long. I would like to ask those who have experience with feasibility studies here – what is the required level of detail in the design? What needs to be done?
Reply #22010-09-27
For details, see the 2008 edition of the \"Regulations on the Depth of Preparation for Architectural Engineering Design Documents\"
Reply #32010-09-30
OP, general industrial plants should follow the feasibility study preparation regulations appropriate for their respective industries based on the manufacturing processes involved.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.