Our company’s coking plant uses a two-stage crushing process: there is primary crushing before the coal storage area, with the requirement that 85% of the coal particles be smaller than 3 mm; after the coal is mixed, secondary crushing takes place, with the requirement that 87–92% of the particles be smaller than 3 mm. Please have an expert determine whether secondary crushing is needed If necessary, does all individual coal types (coking coal, 1/3 coking coal, fat coal, lean coal, long-flame coal) need to be crushed?
Reply #22010-09-26
It depends on your manufacturing process; you can go into details so that everyone can discuss it
Reply #32010-09-27
Our coking plant uses TJL4350F rammed coking ovens, and the coking coals employed are JM, 1/3JM, FM, SM, and CY; the particle size requirements are as specified above, with the moisture content of the coal entering the oven being 9–11%. Now each type of coal is being crushed, and there are intermittent increases in current; it’s difficult to push the coke along. Nothing has been adjusted, but it should get better after a day. Has there been any separation of the coal during transportation?
Reply #42010-09-30
Generally, the process used for producing rammed coke involves pre-crushing, mixing, and then crushing. The pre-crushing step involves selective crushing; lean coal, bituminous coal, and 1/3 coking coal all need to be pre-crushed, and I believe long-flame coal also requires pre-crushing!
Reply #52010-10-05
The preliminary pre-crushing is a selective crushing process; lean coal, gas coal, and 1/3 coking coal require pre-crushing. I believe long-flame coal also needs to be pre-crushed!
Reply #62011-06-08
After pre-crushing, followed by coal blending and then secondary crushing, there should be no issue with large fluctuations in current flow. Also, 85% of the material needs to reach a size of less than or equal to 3 mm; secondary crushing is still required. I’m not sure about this

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.