HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seek help regarding issues of quality acceptance and evaluation (petrochemical construction)

2010-10-11View Original

Thread Content

This post was last edited by ms3210 on 2010-10-29 at 10:53. My QQ number is 122657670; feel free to reach out for communication. Petroleum and chemical engineering construction techniques and quality management: I. Regarding self-inspection records. ① Now there is the \"Technical Document for Construction Process\" (SHT3543-2007), and it is required to be used in projects – does that mean the previous self-inspection forms are no longer needed? ② Are all self-inspection records filled out in accordance with 3543 and submitted for inspection? (There is a generic form 3543-G122 for installation inspection records; all fields are empty. The standard specifies that it can be filled in as needed.) ③ If that’s the case, have the 3543-G122 installation inspection record form, which includes the inspection items and has been updated for various specialties, been prepared? II. Regarding quality acceptance and quality assessment. Generally, there are no clear requirements in the early stages for the two tasks of quality acceptance and quality assessment. I see that there are currently two sets of specifications: one set consists of (GB 50252‑2010 Unified Standards for Quality Inspection of Industrial Installation Projects and GB50300-2001 Unified Standards for Quality Inspection of Building Construction Projects). These standards are titled Unified Standards for Quality Inspection, and the content of the tables can be modified. The other set is organized by specialty, with inconsistent names (Code for Acceptance of Construction Quality of Building Electrical Engineering (GB50303-2002), Code for Acceptance of Construction Quality of Steel Structure Engineering GB50205-2001, SH 3514-2001 Standards for Inspection and Evaluation of Construction Quality of Petrochemical Equipment Installation, GB50185-93 Standards for Inspection and Evaluation of Construction Quality of Insulation Works for Industrial Equipment and Pipelines, GB 50131-2007 Code for Acceptance of Construction Quality of Automation Instrumentation Engineering – these are the ones mentioned in the design documents). Both sets of forms have their own tables; previously, the content of the tables from the second set was copied into those of the first set, with inspections required to be carried out during the construction process. I would like to ask: ① Are these two sets of forms what is referred to in the concept of \"separation of inspection and evaluation\" as quality acceptance and quality assessment? ② Does that mean both sets of tables need to be created? ③ If it needs to be done, do both sets of tables have to be prepared and submitted for approval during the process? ④ Are these two sets of forms available? Relevant standards: 1. 3543-G122 Installation inspection record; 2. GB 50252–2010 Unified standard for quality acceptance of industrial installation projects; 3. GB50300-2001 Unified standard for quality acceptance of building construction projects; 4. GB50184-93 Quality inspection and evaluation standard for industrial metal piping projects; 5. GB50303-2002 Code for quality acceptance of building electrical engineering projects; 6. SH 3514-2001 Quality inspection and evaluation standard for petrochemical equipment installation projects; 7. GB 50131-2007 Code for quality acceptance of automation instrument engineering projects; 8. GB50185-93 Quality inspection and evaluation standard for insulation projects of industrial equipment and pipelines
Reply #22010-10-15
What industry is the poster from? If it’s Sinopec, there are specific standards for quality assessment
Reply #32010-10-16
Generally speaking, in the petrochemical industry, SH3524 is used for equipment, GB50184 for pipelines, GB50205 for steel structures, and GB50185 for insulation – all of these standards are used for quality assessment purposes.
Reply #42010-10-18
The separation of inspection and evaluation refers to the distinction between quality inspection and quality assessment; quality inspection involves checking the quality of construction processes, while quality assessment entails evaluating the quality of individual sub-projects or entire projects based on the records of quality inspections conducted after submissions, to determine whether they are qualified or excellent.
Reply #52010-10-29
Thank you. If anyone upstairs is interested, please join the group 70591728

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.