Conversion furnace in dry gas hydrogen production plant

2010-10-25View Original

Thread Content

This post was last edited by shiwang528 on 2011-1-26 at 21:46. It says, “During the cooling phase toward the end of heating up the converter, be careful that the furnace tubes do not get stuck.” What does it mean for the furnace tubes to get stuck?
Reply #22010-10-25
Since the temperature changes significantly as the converter cools down, the furnace tubes contract greatly; any misalignment or failure of the support springs at the top of the furnace can cause damage to these tubes.
Reply #32010-10-27
During the cooling process, the contraction of the furnace tube is restricted
Reply #42010-10-28
During the cooling phase after the heating up of the converter, the furnace tubes contract. If the spring hangers at the top of the tubes do not return to their proper position, the high temperature can cause the tubes to deform. It is recommended to record the expansion of the furnace tubes at each temperature during startup and shutdown to prevent jamming.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.