HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The plan for three checks and four determinations

2007-08-14View Original

Thread Content

The three inspections and four determinations are steps that must be carried out before project acceptance. Many problems can be identified during this process, which facilitates the creation of conditions for future joint commissioning tests. But after looking up a lot of information, I found that it only mentions the concept of “three checks and four determinations,” without providing any specific plans for implementing them. If anyone knows anything on this topic, please advise me!
Reply #22007-08-29
I have a specific implementation plan for the three inspections and four determinations.
Reply #32007-08-31
Three checks: check for design omissions, check for potential issues in construction quality, and check for unfinished work; Four fixations: For the issues identified during inspections, tasks, responsible persons, measures, and deadlines for correction are determined. Specifically, by reviewing any omissions in the design drawings, it is possible to reduce the costs associated with rework after the project is completed, while still ensuring that it meets practical usage requirements. Determine whether the construction contractor has cut corners by reviewing the volume of work ; Reduce potential risks in projects by reviewing concealed inspections ; The issues identified through the three checks determine the contents of the four fixations later on ; Assign tasks ; Either make corrections or increase the workload; set a deadline: by when the additional work must be completed, which puts pressure on the construction company ; Fixed personnel: Ensuring the availability of personnel is the primary factor in ensuring timely delivery ; Measures to be taken: In cases where the problems are caused by the construction contractor itself, it is necessary to establish construction measures to ensure the quality and schedule of the project.
Reply #42007-08-31
Who will conduct the inspection? The supervisors or supervision engineers are always on site for supervision; it’s impossible that they would be the ones to carry out the inspection
Reply #52011-01-12
I need a specific plan, not a noun definition
Reply #62011-01-12
Specific implementation plan for the three checks and four determinations
Reply #72011-02-23
I learned it! ! ! ! I really miss the original poster!
Reply #82018-06-26
Could you share the plan for three checks and four confirmations? Thank you

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.