HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to represent the start/stop of motors controlled at the site and those controlled from the control room on a PID diagram?

2010-10-28View Original

Thread Content

This post was last edited by wp8 on 2010-10-28 at 20:36. I would like to ask fellow users: How can “on-site control of motor start/stop” and “control of motor start/stop from the main control room” be represented on a PID diagram? I’ve seen “on-site control of motor start/stop” represented by HS+a circle, so how is “control of motor start/stop from the control room” represented?
Reply #22010-11-01
\"On-site control of motor start/stop\" is represented by HS+a circle, while \"Control of motor start/stop from the main control room\" is represented by HS+a circle with a horizontal line in the middle
Reply #32011-01-04
:Funk: No one is answering. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.