HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to measure the pressure drop in the tubes after loading the catalyst?

2010-11-04View Original

Thread Content

During the process of loading the synthetic catalyst, in order to ensure that the amount of catalyst in each tube is consistent, it is often necessary to measure the pressure drop in the tubes that have already been filled with catalyst. How is this pressure drop measured?
Reply #22010-11-09
If anyone knows, please let me know; this issue has a direct impact on the subsequent operation of the synthesis tower
Reply #32010-11-10
Why not? Is the gas source corrosive?
Reply #42010-11-10
Reply to 5# losterknight: Going straight to the pressure measurement point isn’t what I meant. What I’m referring to is that after the catalyst has been loaded, and before any gas is introduced, it’s necessary to measure the pressure drop across the heat exchanger tubes. How does one do that?
Reply #52010-11-10
It can be done by using a conversion furnace tube: a supply line for instrument air is used, connected to a pressure gauge; a orifice plate is then used to stabilize the pressure before the orifice plate, with another pressure gauge attached as well. The air line is inserted into the tube bundle through a rubber plug. The resistance of each tube is measured by reading the value on the second pressure gauge.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.