Thread Content

I would like to thank all of you here first. I’m seeking information regarding the metering and loading/unloading of crude oil tankers; the more detailed, the better!
Reply #22010-11-09
Let’s start with some knowledge about loading and unloading first. Thank you so much, hero!
Reply #32010-12-03
This post was last edited by Nanhai Anqi on 2010-12-3 at 20:46. Make use of Baidu searches regularly to look up information on “crude oil handling” as well as the basic requirements for handling crude oil and petroleum products. The methods of handling crude oil and petroleum products include railway transportation, water transport, road transportation, and direct pipeline transfer. Depending on the properties of the oil, it can be divided into light oil handling and heavy oil handling ; From the perspective of oil loading and unloading processes, it can be further divided into types such as top-loading/unloading, bottom-loading/unloading, gravity feeding, and pumping. However, apart from direct pipeline transportation, regardless of the loading and unloading method used, the loading and unloading of crude oil and petroleum products must meet the following basic requirements: (1) It must be carried out using specialized facilities and equipment. The specialized facilities for the loading and unloading of crude oil and petroleum products include: dedicated railway lines and tank cars, oil terminals or berthing points, oil tankers, piers or operation platforms, etc ; Special equipment mainly includes: oil loading and unloading pipelines, oil collection pipes, oil transfer pipes and pumps, oil filling equipment, viscous oil heating equipment, flow meters, etc. (2) It must be completed within the designated work area. There are dedicated areas for the loading and unloading of crude oil and petroleum products. These areas are usually equipped with isolation facilities to separate them from the surrounding environment, and they must meet strict requirements regarding fire prevention, explosion prevention, lightning protection, and static electricity control. (3) It must be carried out by professionally trained technical personnel. (4) There are strict requirements regarding the time and speed of loading and unloading. Transporting oil products ⑴ Deliver them from the loading site to the unloading site on time and safely as required. ⑵ Its load weight must not exceed the load waterline. ⑶ During loading and unloading, pollution and spills must be avoided. ⑷ Personnel working on oil tankers must hold an oil tanker operation certificate issued by the port authority. ⑸ Explosion-proof tools must be used correctly when installing and removing oil pipes. ⑹ The oil transfer hose connecting the ship to the shore should have sufficient length. Oil filling ⑴ When connecting the oil pipeline between the ship and the shore, it is necessary to install the grounding wire first, and then connect the oil pipeline. ⑵When installing the grounding wire, the end on land is first connected to the oil pipe and led underground. A switch is installed in the middle of the grounding wire; the switch is turned off first, then the end of the grounding wire on the ship is connected to the ship’s hull, and finally the switch is connected. ⑶Open the inlet pipeline valve leading to the oil tank and the valve of the stern oil storage tank, and close the outlet pipeline valve and the valves of the other oil tanks. ⑷The oil feeding should start slowly; check that the oil pipes, fittings, gate valves, etc. are free of defects, and ensure that the oil is flowing properly into the designated tank without any leakage. Only then can shore personnel be informed to gradually increase the oil feeding speed. After the normal speed is reached, further inspections should be conducted. Slow down before finishing filling with oil to avoid spills. ⑸During the entire oil filling process, someone must remain at the inspection hole, and the duty personnel should regularly monitor the oil filling speed. ⑹Half an hour before terminating the loading process, the shore side should be notified to get ready; the shore side should be informed to slow down as progress is made, so that pumping can be stopped in time once the last tank is filled. ⑺The oil loading speed is fast, and the ship’s draft changes significantly; the crew on duty must pay attention to adjusting the tension of the cables at all times. ⑻After the entire ship has been filled with fuel, remove the hoses first, and then the static ground wire. ⑼Close the large valves of each compartment and seal all gate valves on the pipelines with lead seals. ⑽Assist the relevant personnel in sealing each cabin hatch, opening, and pipeline gate valve with lead seals. Unloading of oil ⑴ Upon arriving at the unloading location, contact the consignee promptly to inform them of the type and quantity of oil. ⑵Tie down the bow line, stern line, and shunt lines. ⑶The ships are connected to each other with copper wires, which are then connected to the earth’s static ground wire. ⑷The oil transfer hose connection must have no fewer than 4 fastening bolts; oil-resistant sealing rings should be placed between the flanges, and an oil collection tray should be installed below. ⑸Assist the relevant personnel in checking the lead seals. ⑹Start the oil unloading slowly; once it has been confirmed that the oil pipes, connections, and gate valves are free of defects, gradually increase the unloading speed. After reaching the normal speed, inspections should be conducted again. ⑺During the oil unloading process, attention should be paid to adjusting the tension of the cables. ⑻Before the unloading is complete, wait for the valves on shore to be closed before closing the valves on the ship. ⑼Remove the hose first, then the static ground wire.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.